Food & BeverageZammit LV Infrastructure Upgrade
On Top was selected to provide a total rewire and major design-and-construct reconfiguration of the 1950s Zammit Smallgoods facility at Pendle Hill with Wiley & Co.
View projectOur experience includes staged plant upgrades, hygienic environments, insulated panel works, production equipment interfaces, distribution and controls.
Our experience includes staged plant upgrades, hygienic environments, insulated panel works, production equipment interfaces, distribution and controls.
Discuss a food & beverage project
Food & BeverageOn Top was selected to provide a total rewire and major design-and-construct reconfiguration of the 1950s Zammit Smallgoods facility at Pendle Hill with Wiley & Co.
View project
Food & BeverageThe Zammit facility at Pendle Hill replaced approximately 3,000 m² of ageing insulated panels with new EPS panels. Concurrently, On Top installed new lighting, power systems, stainless-steel conduits, subcircuit cabling and distribution boards within the facility.
View project
Food & BeverageOn Top provided the electrical and communications components of the design-and-construct package.
View project
Food & BeverageOn Top was engaged to provide a major design-and-construct overhaul of existing electrical infrastructure.
View project
Food & BeverageOn Top delivered major new low-voltage infrastructure for a production facility in Smeaton Grange.
View project
Food & BeverageElectrical services for an extension to an existing pre-pack salad facility in Smeaton Grange.
View project
Food & BeverageCoca-Cola Amatil scheduled a 14-day facility shutdown for works including new cool-room panel ceilings, epoxy flooring and wall coverings. On Top ran two shifts to support the program.
View project
Commercial Fit-OutThe Tooheys Lidcombe facility required a new staff lunch room and locker room.
View project
Food & BeverageThe Zammit facility at Pendle Hill required a new freezer for bulk stock storage.
View project
Food & BeverageWith the existing roof requiring urgent replacement, On Top was engaged by McMahon Services to disconnect and relocate existing roof-mounted distribution boards that presented a hazard to maintenance crews.
View project
Food & BeverageOn Top was engaged by Wiley to provide design-and-construct rebuild works for the Haverick Meats facility at Banksmeadow following a total-loss fire in 2016.
View projectWe help clients identify constraints and deliver projects with a practical approach.